This is a demonstration site built to show what’s included. This business is not real. All Inclusive Websites →
General contractor · Remodels & additions · Licensed & bonded

The bid you can hold us to.

Bluetape writes bids like contracts because they become one — every allowance named, every exclusion listed, every draw tied to a milestone you can see. The lowball-then-change-order playbook doesn't work when the scope has no gaps.

Scoped bids in 2 weeks · Remodels from $45k · Additions from $95k · References: the last 10 clients, not a curated 3

Get a Scoped BidSee Projects

▣ Draw schedule tied to completed milestones — you never pay ahead of the work.

Bid anatomy — primary bathNO GAPS
Demo, plumbing & electrical rough

Permits itemized, not "included-ish"

$14,200
Tile & waterproofing

Schluter system specified by name

$11,800
Fixtures allowance

$4,500 named — overspend is your choice, in writing

$4,500
Exclusions listed

Window replacement, structural surprises — priced IF found, before work

PAGE 2
Total — the number that holds

Changes only if YOU change scope

$38,400
Projects

Remodels. Additions. Whole floors.

Interior Remodels

Kitchens, baths, basements, and the load-bearing wall between you and an open plan — engineered, permitted, done.

From $45k

Additions

Second stories, bump-outs, ADUs. Foundation to finish with one accountable builder and a schedule your family can plan around.

From $95k

Insurance & Structural

Storm damage rebuilds and the structural repairs other bids waved at vaguely — engineer-stamped, documented for your carrier.

Scoped after engineer visit
Track record

Boring paperwork. Beautiful houses.

0

contractor-initiated change orders in 3 years — scope gaps are our problem

10

most recent clients offered as references — no curation

170+

projects since 2014 · licensed, bonded, insured

100%

of draws tied to milestones you can walk and see

"Their bid was $9,000 higher than the low one. Then I read both: the cheap bid had no waterproofing spec, a $1,500 fixture allowance, and 'permits by owner.' Bluetape's number was real. It ended real."

Bath + kitchen · closed on budget
Straight answers

Before you compare bids

Why is your bid higher than the others?

It usually isn't — it's just complete. Put the bids side by side and check three things: named allowances (ours are realistic, not $1,500 fixture fantasies), listed exclusions, and who pulls permits. The cheap bid's gaps become your change orders by month two.

What happens when you open a wall and find horror?

Work stops, you get photos, and a priced option sheet within 48 hours — repair paths with real numbers, before anything proceeds. Pre-existing conditions aren't your fault or ours; surprise invoices for them would be ours.

How does the draw schedule protect me?

Payments release when milestones complete — demo done, rough-in passed, cabinets set — never on calendar dates. You're never funding work that hasn't happened, which is also exactly why our schedule stays honest.

How far out are you booked?

Typically 6–10 weeks to break ground — real builders have real backlogs. A contractor who can start Monday is answering a question you should ask twice.

The funnel behind the site

How Bluetape wins with the higher number.

Ad · Google Search

General Contractor — Bids With No Gaps

Named allowances, listed exclusions, milestone draws. Last 10 clients as references.

Ad · Facebook

"The cheap bid becomes expensive in month two."

Free bid-comparison checklist — audit any contractor's scope, including ours.

Ad · Retargeting

Your scoped bid takes two weeks. Ground breaks in eight.

Factual backlog status + the walkthrough calendar.

Post-walkthrough email sequence
Scoped bids in 2 weeks

Read page two before you sign anything.

Ours or anyone's — the exclusions page is where remodels are won or lost.

Get a Scoped Bid

▣ Licensed, bonded, insured · GC #GB-8834 · milestone draws always